JPC has been appointed to provide Cost Advice services for the provision of a high voltage power supply to the Riverside Sawmill, Hull.
Project Summary
Due to the expansion of the existing facility, the client requires the installation of a 2.5MVA connection to the Riverside Sawmill, Hull, to NPG specifications.
The project involves substantial civil works to connect the sawmill with high voltage circuitry, including:
-
The excavation and reinstatement of 1400 meters of public carriageway, footpaths and verge for cable installation.
-
The laying of 2000 meters of high voltage cable
-
The installation of a High Voltage metered substation
Calling on their extensive commercial experience, JPC are working closely with the engineering consultants and the client to ensure that the site is provided with a cost effective installation on a timely basis.